LIST OF BLDG ENGINEERED BY AERTECNO |
| |
LOCAL EQUIPMENT ROOM BUILDINGS: |
|
1 |
LOGISTIC SUPPORT AREA (LSA) L.E.R. |
|
2 |
LOGISTIC SUPPORT AREA (LSA) HVAC BLDG |
|
3 |
PROCESS SUPPORT AREA 1 (PSA1) L.E.R. |
|
4 |
PROCESS SUPPORT AREA 1 (PSA1) HVAC BLDG |
|
5 |
PROCESS SUPPORT AREA 2 (PSA2) L.E.R. |
|
6 |
PROCESS SUPPORT AREA 2 (PSA2) HVAC BLDG |
|
7 |
DRILLING EAST AREA (DIE) L.E.R. |
|
8 |
DRILLING EAST AREA (DIE) HVAC BLDG |
|
9 |
DRILLING ISLAND (DI) L.E.R. |
|
10 |
DRILLING ISLAND (DI) HVAC BLDG |
|
11 |
PROCESS UTILITY AREA (PUA) L.E.R. |
|
12 |
PROCESS UTILITY AREA (PUA) HVAC BLDG |
|
13 |
RISER ISLAND L.E.R. |
|
14 |
RISER ISLAND HVAC BLDG |
|
15 |
ISLAND "A" L.E.R. |
| |
EMERGENCY BUILDINGS: |
|
16 |
EMERGENCY DIESEL GENERATOR BLDG |
|
17 |
IBEEV SHELTER |
|
18 |
DRILLING ISLAND TEMPORARY REFUGE 140 POB |
|
19 |
IBEEV UTILITIES BUILDING |
|
20 |
TEMPORARY REFUGE BARGE 900 POB |
|
21 |
DRILLING ISLAND B.A. RECOVERY STATION |
|
22 |
PSA1 B.A. RECOVERY STATION |
|
23 |
PSA2 B.A. RECOVERY STATION |
| |
PROCESS UTILITY BUILDINGS: |
|
24 |
PUA METHANOL PUMP HOUSE |
|
25 |
PUA CHEMICAL INJECTION PUM HOUSE |
|
26 |
PUA START-UP FUEL GAS COMPRESSOR |
|
27 |
PUA LEAK TEST NITROGEN COMPRESSOR |
|
28 |
PSA1 OIL BOOSTER PUMP HOUSE |
|
29 |
PSA1 OIL EXPORT PUMP HOUSE |
|
30 |
PSA2 OIL BOOSTER PUMP HOUSE |
|
31 |
PSA2 OIL EXPORT PUMP HOUSE |
|
32 |
LSA WAREHOUSE |
|
33 |
LSA GARAGE |
|
34 |
LSA ACV HANGAR |
|
35 |
LSA ACV WORKSHOP AND STORE |
|
36 |
BREATHING AIR (WABAS.) CASCADE SYSTEM |
|
37 |
RIGGING STORE |
|
38 |
SCAFFOLDING STORE |
|
39 |
FLAMMABLE GAS STORE |
|
40 |
PAINT & SOLVENT STORE |
|
41 |
CHEMICAL STORE |